United States

United States

Platte River Power Authority: correction

Platte River Power Authority of Fort Collins, Colorado, is installing five Vestas V-47 660 kW turbines-3.3 MW-at Medicine Bow in Wyoming by September 30 for a green pricing program, not 1.5 MW of turbines from Terra Moya Aqua/Global Wind Energy by June 30, as reported in our table of PTC projects last month (Windpower Monthly, June 1999). We regret any confusion the error caused.

Have you registered with us yet?

Register now to enjoy more articles
and free email bulletins.

Sign up now
Already registered?
Sign in

Windpower Monthly Events


Latest Jobs