First power at Formosa 2 offshore wind farm

First power has been delivered to the Taiwanese national grid from JERA, Macquarie’s Green Investment Group and Swancor Renewable Energy’s 376MW Formosa 2 project.

The offshore wind farm in the Taiwan Strait is due to feature 47 of Siemens Gamesa’s SG 8.0-167 DD turbines. Twelve have now been installed.

The project is expected to be fully operational later this year.

Have you registered with us yet?

Register now to enjoy more articles
and free email bulletins.

Sign up now
Already registered?
Sign in