Ørsted starts building 500MW-plus wind-solar hybrid in US

Ørsted’s 518MW Helena Energy Center in southern Texas consists of a 268MW wind farm and 250MWAC solar PV array

by Craig Richard
Ørsted’s onshore operational and under-construction portfolio has now reached 4GW, and includes the Sage Draw wind farm in Texas (above)
Ørsted’s onshore operational and under-construction portfolio has now reached 4GW, and includes the Sage Draw wind farm in Texas (above)

Sign in to continue

Sign in 

Trouble signing in?

Reset password: Click here

Email: subscription@windpowermonthly.com

Call: 020 8267 4327

Register for
Free Trial

  • 7 days limited access to member-only content

Register

Become a member

  • News and intelligence on global wind energy markets
  • Breaking industry news and email bulletins
  • Analysis of the lastest trends to help you make informed decisions
  • Searchable content archive dating back to 1994

Explore Membership Packages