In September, the first prototype blade of Vestas' 8MW V164 was produced at its research centre on the Isle of Wight, UK. The 80-metre blade, the longest produced by the company, will be tested for six months.
The V164-8MW prototype will be installed in the first quarter of 2014 at the Østerild testing centre.