Australia

Australia

Vestas V112 failure down to 'human error'

DENMARK: Vestas' investigation into the blade failure on its prototype V112 3MW turbine has found the incident was the result of human error during the manufacturing process.

Google Translate

The company admitted the manually-produced blade had not been subjected to Vestas’ normal testing programme prior to installation. Subsequently, it said it was changing its testing process to ensure prototype components met a higher criteria.

To ensure transparency over the verdict, Vestas said it would be appointing a third-party to conduct an independent investigation into the failure.

The failure follows only weeks after Vestas signed a deal with a group to supply 140 of the turbines for a 420MW project in Australia, which will be the largest in the southern hemisphere.

Responding to questions at the time questions over whether the turbine had been tested enough for such a large project, Vestas president Ditlev Engel insisted the turbine had been thoroughly tested. Engel added that he was "very confident" it was ready to be installed on a wind farm of this size.

According to reports, a 6-metre to 7-metre portion of a blade broke off the prototype yesterday. In response, Vestas said it was investigating the reasons but denied it was a design failure.

Have you registered with us yet?

Register now to enjoy more articles
and free email bulletins.

Sign up now
Already registered?
Sign in

Windpower Monthly Events


Latest Jobs