Next Generation Offshore Turbines
2011 has been notable for the launch of a number of new generation offshore turbines. Predominantly, these are set to come into production around 2015 in time for the UK's 33GW Round 3 offshore projects.
In recent months, Windpower Monthly technical writer Eize de Vries has examined these new products and spoken to the designers.
GE 4.0-110 offshore wind turbineGE's first offshore turbine since 2003 | |
Vestas V164 7MW offshore turbineVestas sticks with gears over direct drive | |
Nordex N150/6000 offshore turbineNordex believes reliability will be a big factor with the N150 | |
Siemens SWT-6.0 120 offshore turbineSiemens preferred to build its prototype prior to launch | |
Repower 6M seriesA look at the 6M's precursor, the 5M | |
![]() | Condor's 5MW offshore turbineThe company discusses its two bladed turbine |
| Alstom's Haliade 6MW offshore turbineAlstom targets both the UK and France with its direct drive |
- Offshore Business Manager- UK and Ireland, nkt cables
- Excellent salary package + car + Group benefits, Flexible
- Wind Loading Engineer, Lloyd's Register
- Competitive, Bristol
- Turbine Engineer, ERSG
- 30-40K, North London
- Project Engineer - Subsea Cables. Holland. €50-€75k + benefits, Viridium Associates
- EUR 50-75K + Benefits, Holland
NEWS BY EMAIL
Windpower Weekly : Preview
Windpower Daily : Preview
Windpower Offshore : Preview
Register here for free bulletins. If you are a subscriber or already get a bulletin, you can manage your bulletins at My Windpower Monthly (you will need to log in first).
Directory
Find products, services and suppliers











