Enbridge is taking a majority stake in the C$275 million project, which will be located on the north shore of Lake Superior. RES, the original developer of the project, retains a minority stake and will be responsible for constructing the wind farm under contract to the partnership. "This project represents a significant step in reaching our goal of generating a kilowatt of renewable energy for every kilowatt our operations consume," says Enbridge chief executive Patrick Daniel. The partnership follows a similar arrangement reached between the two companies last November for the 99MW Talbot wind project in Ontario. Both facilities are set to use Siemens 2.3MW turbines.
Wind Wire: Canada - Firms team up for 99MW Ontario plant
Calgary-based pipeline giant Enbridge is teaming up with Renewable Energy Systems Canada (RES) to build the 99MW Greenwich wind project in Ontario.
Windpower Monthly Events
Latest Jobs
-
Wind Farm Manager x 2 - (Teesside) Wind Farm Manager x 2 - (Teesside) The Natural Power Consultants Limited Teesside Area
-
Installation Engineer (Substation Jacket) Installation Engineer (Substation Jacket) Taylor Hopkinson Associates North East
-
Health, Safety, Quality and Environmental Consultant Health, Safety, Quality and Environmental Consultant Taylor Hopkinson Associates North Germany
-
Head of Offshore Cables. London, UK Head of Offshore Cables. London, UK Viridium Associates London
-
Senior Project Developer Senior Project Developer Viridium Associates London
